ecm5tools
CM STANDARDS MANUAL

By: Frank Watts, BSME, CCM
Ever wished you had the CM procedures manual from a Best In Class product manufacturing company? Here it is! In fact, it is the best of the best practices. With this tool, satisfy Total Quality Management and ISO/QS/AS 9000 process documentation requirements and good management practices for Engineering Documentation Control (EDC) / Configuration Management (CM).
  • Includes 76 pages, 45 EDC/CM standards derived from the "best of the best" practices as witnessed by Frank Watts.
  • Includes generic forms and form instructions and process work flow diagrams (in addition to the pages mentioned above)
  • Includes a 100 day money back guarantee per the license agreement
  • Includes free telephone consultation on the application of the product to your process for a period of one year per the license agreement.
  • Helps you take a giant step beyond satisfying ISO / QS / AS 9000 to best in class documentation requirements
  • License agreement covers one Documentation Control Function only.

Bound in a three ring binder with Your Name & Company Name

Covers:
General EDC / CM Practices
BOM Practices
Release (new item, drawing or product)
Change Request
Change Control
Field Changes
Change Costing
Users Guide
Definitions

Can be purchased with or without an MS Word file of the Standards. The MS Word File does NOT contain the forms and flow diagrams which are only in the Hard Copy.

STANDARDS MANUAL CONTENTS

 #  TITLE  PAGES
 01 Policy EDC / CM  3
 02 Writing EDC Standards  3
 03 EDC Requirements For Drafting Standards  2
 04 Document Groups  2
 05  Teams For All EDC Processes  2
 06 Cognizant Engineers  2
 07 Part Numbers  1
 08 Quantity and Units of Measure  1
 09 Bills Of Material  1
 10 Approved Manufacturers List  1
 11 Deviations  2
 12 Spare Parts  1
 13 Prints / Points of Use / Paper-less  1
 14 Signatures  1
 15 Class Coding / Naming Conventions  3
 16 Tabulated Documents 2
 17 Nameplate and Serial Number 1

 20 Release Policy 20  2
 21 Teams In The Release Process  1
 22 Phase Release  2
     
 30  Change Request Policy  2
31  Team In The Request Process  1
 32 The Request Form  1
     
 40  Change Control Policy  3
 41  Team In Change Process  1
 42 The Change Form  1
 43  Interchangeability  2
 44 Part Number & Revision Level Changes  2
 45  Change Classification  1
 46 Mark Up of Design Documents  2
 47  Effectivity Point  2
 48  Effectivity Setting  2
 49 Disposition of Old Design Parts  1
 50  Impacted / Affected By A Change  1
 51  Change Affect On Field Units  1
 52 Design Complete  1
 53  Tracking Actual Effectivity  2
 54 Line Down Change  1
 55  Closing a Change  1
 56  Configuration Status  1

 60 Field Changes  1
 61 Field Change Form  2
 70  Costing Design Changes  2
 80  Users Guide / CM Plan  5
 90  Definitions  3
     
 45  Total Standards 76 Total Pgs

(Top of Page)
BACK TO LITERATURE PAGE

For More Info

EXCEPTIONAL CONFIGURATION MANAGEMENT HOME PAGE


©1999 EC3 Corp - Copyright material may be copied from this site for your one time personal use. Do not reproduce. All rights reserved. Others may visit this site to obtain a copy.