
PROCESS DESIGN
HELP
By: Frank Watts BSME, CCDM
- Bridge the gap between Engineering and the rest of
the operation.
- Develop a faster and more accurate change management system.
Reduce your thru-put time for CM to three to five work-days.
Save scrap, rework, implement cost reductions quicker, avoid
field retrofit and supplier costs that long thru-put causes.
- Real reduction in the number and cost of changes.
- Design and implement a new minimum significance Part Number.
- Fast new product release process. Clarify your document and
product release process and enjoy the benefits of faster time
to market.
- Eliminate the "throw it over the wall syndrome".
- Need help figuring out how to manage that pile of change
requests that have Manufacturing, Service, Sales and Customers
so frustrated?
- Bridge the gap between marketing / sales and the rest
of the company with best in class identification and order
entry techniques.
- Minimize CM / EDC control while minimizing risks with best
in class work flow.
- Frank does not design processes for you, rather
he facilitates your own development of your own process. Ask
about a process design workshop.
- Work out a combination of on site and/or telephone/email
support for aid in developing a best of the best streamlined
processes for your culture, environment, systems and resources.
Click
here for a biography of Frank Watts
BACK
TO CONSULTING PAGE
For More Info

EXCEPTIONAL CONFIGURATION
MANAGEMENT HOME PAGE
©1999 EC3 Corp - Copyright material
may be copied from this site for your one time personal use.
Do not reproduce. All rights reserved. Others may visit this
site to obtain a copy.
|